Beautiful new construction pool deck. The client wanted a low profile deck with wrap around steps up to the pool.
Constructed of green treated lumber and decking.
The client wanted an existing section of the deck that was a step down from the rest of the deck to be raised so it was all one level.
The lower section was removed and a new section was built at the same level to seamlessly match up with the rest of the deck.
Amazing pool deck made of PVC decking. I love working with new materials to see how they perform compared to more standard materials. PVC decking stays up to 30º cooler compared to other decking.
Large backyard deck that was refinished with composite decking and composite handrail. The client was tired of sanding and staining the green treated decking and was also tired of the splinters. Composite lasts for over 25 years with minimal maintenance. Just wash it when it’s dirty!
Another pool deck constructed of cedar decking, composite handrail and treated lumber for the framing.
This project was completed throughout the winter, so it is possible to have your deck ready to go before spring!
Cedar porch that was redone to replace rotting handrails and columns. Columns are wrapped in cedar and handrail and spindles are also cedar.
Cedar deck staircase. Our signature touch is the picture frame design around the deck border and each stair. It gives it a beautifully finished look.
Deck platform build for a shed to be placed on top. Ground was very unlevel so the platform is partially in ground for a perfectly level shed.